665 PAT-MPL (Sofamel)
High-voltage overhead lines and substations
Phase earthing and short-circuit equipment for high-voltage overhead lines.
The main aim of its installation is the operator’s protection against accidental commissioning or possible voltage return during repair operations.
According to IEC 61230 standard.
Composed of:
- 3 MPL aluminum alloy clamps with screw tightening for cylindrical conductors with diameters between 5 and 45 mm and flat bars.
- 3 copper cables with PVC insulation. Section and length depending on the model.
- 3 TT-50 milling earthing lathe.
- 3 nylon bags to store and transport the equipment.